Key Insights
The China data center construction market, valued at approximately $15 billion in 2025 (estimated based on provided CAGR and market size), is experiencing robust growth, projected to expand at a compound annual growth rate (CAGR) of 3.54% from 2025 to 2033. This expansion is fueled by several key drivers. The surge in digital transformation across various sectors, including IT & telecommunications, BFSI (Banking, Financial Services, and Insurance), and government, necessitates increased data storage and processing capabilities. The increasing adoption of cloud computing and the rise of big data analytics further amplify demand for sophisticated data center infrastructure. Furthermore, government initiatives promoting digitalization and technological advancement within China are significantly contributing to this growth trajectory. Significant investments in next-generation technologies like 5G and AI are driving the need for advanced data center facilities capable of supporting high-bandwidth, low-latency applications. The market is segmented by data center size (small, medium, large, mega, massive), infrastructure components (cooling, power, racks, servers, networking equipment, security), end-user sectors, and tier type (Tier 1-4). While the market faces potential restraints such as high initial investment costs and stringent regulatory compliance requirements, the overall growth outlook remains positive due to the prevailing demand and ongoing technological advancements.
The competitive landscape is characterized by a mix of international and domestic players, including prominent construction firms, IT infrastructure providers, and design consultants. Companies like IBM, AECOM, and others are actively involved in building and supporting the expanding data center infrastructure in China. The market's future trajectory hinges on the sustained growth of digital economies within various sectors, ongoing investments in advanced technologies, and supportive government policies. The market's geographic focus is primarily on China, offering significant opportunities for companies specializing in data center construction and related services. Further market segmentation analysis will reveal specific opportunities within different tiers, infrastructure components, and end-user sectors, allowing for targeted investments and strategic partnerships. The ongoing expansion of cloud computing services by major players will likely further stimulate demand, ensuring sustained growth in the data center construction sector within China.

China Data Center Construction Market Report: 2019-2033
This comprehensive report provides a detailed analysis of the China data center construction market, offering invaluable insights for industry professionals, investors, and strategic decision-makers. With a study period spanning 2019-2033, a base year of 2025, and a forecast period of 2025-2033, this report unveils the market's trajectory, identifying key trends, challenges, and opportunities. The report leverages extensive data and expert analysis to present a clear picture of this dynamic market, valued at XX Million in 2025 and projected to reach XX Million by 2033.
China Data Center Construction Market Market Structure & Innovation Trends
The China data center construction market exhibits a moderately concentrated structure, with a few large players holding significant market share. Market share data for 2024 indicates that the top 5 players control approximately XX% of the market, while numerous smaller firms compete for the remaining share. Innovation is driven by increasing data demands, government support for digital infrastructure, and the adoption of advanced technologies like AI and IoT. The regulatory framework, while evolving, generally encourages investment in data centers, but strict compliance requirements present ongoing challenges. Product substitutes are limited, as specialized infrastructure and expertise are required. The end-user demographic is diverse, spanning IT & Telecommunication, BFSI, Government, Healthcare, and other sectors. M&A activity has been robust, with significant deals totaling approximately XX Million in the past 5 years.
- Key Market Players: SAS Institute Inc, Aueron Group, JE Dunn Construction Group Inc, Kienta Engineering Construction, DSCO Group, IBM Corporation, Sato Kogyo (S) Pte Ltd, Nakano Corporation, Turner Construction Co, DPR Construction Inc, Hensel Phelps Construction Co Inc, Obayashi Corporation, CSF Group, Gammon Construction Limited, M+W Group GmbH, AECOM, NTT Ltd
- Top 5 Players Market Share (2024): XX%
- Total M&A Deal Value (2019-2024): XX Million

China Data Center Construction Market Market Dynamics & Trends
The China data center construction market is experiencing robust growth, driven by factors such as the increasing penetration of the internet and mobile devices, the rising adoption of cloud computing and big data analytics, and supportive government policies. Technological disruptions, particularly in areas like AI, IoT, and 5G, are creating new demand for advanced data center infrastructure. Consumer preferences are shifting towards faster, more reliable, and energy-efficient data center services. The market's CAGR is estimated at XX% during the forecast period (2025-2033), with a significant increase in market penetration, especially in Tier 1 and Tier 2 cities. Intense competition among both domestic and international players is expected to continue, leading to strategic partnerships, technological advancements, and price adjustments.

Dominant Regions & Segments in China Data Center Construction Market
The leading region for data center construction in China is the eastern coastal region, particularly concentrated around Beijing, Shanghai, and Guangdong. This dominance is primarily attributed to the high concentration of major technology hubs, robust digital infrastructure, and favorable government policies.
- Key Drivers of Regional Dominance:
- High concentration of major technology companies
- Well-established digital infrastructure and connectivity
- Supportive government policies and investment incentives
- Abundant skilled workforce
- Proximity to major consumer markets.
Among segments, the Mega and Massive data center size category shows the highest growth potential, driven by hyperscale cloud providers' need for large-scale facilities. The cooling infrastructure segment, including Evaporative Cooling, holds a significant market share, reflecting the crucial role of efficient thermal management in data center operations. Within the end-user segment, the IT & Telecommunication sector leads, followed by the BFSI sector. Tier 3 data centers are the most widely deployed due to their balance between cost and redundancy requirements.
China Data Center Construction Market Product Innovations
Recent innovations focus on enhancing energy efficiency, improving modularity, and boosting security in data center design and construction. The adoption of liquid cooling technologies, AI-powered management systems, and prefabricated modular data centers is gaining momentum. These innovations offer competitive advantages in terms of reduced operational costs, faster deployment times, and enhanced resilience. The market is witnessing a shift towards sustainable data center solutions, driven by increasing environmental awareness and stringent regulations.
Report Scope & Segmentation Analysis
This report segments the China data center construction market by Data Center Size (Small, Medium, Large, Mega, Massive), Infrastructure (Cooling Infrastructure, Power Infrastructure, Evaporative Cooling, Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, Other Infrastructure), End-User (IT & Telecommunication, BFSI, Government, Healthcare, Other End-User), and Tier Type (Tier 1, Tier 2, Tier 3). Each segment's growth projections, market size, and competitive dynamics are analyzed in detail. For example, the Mega and Massive data center segment is anticipated to witness the highest growth rate, driven by the increasing demand for cloud computing and big data analytics.
Key Drivers of China Data Center Construction Market Growth
Several factors are driving the growth of the China data center construction market, including:
- Government Initiatives: The Chinese government's focus on digitalization and the "New Infrastructure" initiative has significantly boosted investments in data center infrastructure.
- Technological Advancements: Continuous technological advancements, especially in areas like AI, cloud computing, and IoT, are fueling the demand for more sophisticated data centers.
- Economic Growth: China's sustained economic growth is generating greater demand for data center services across various sectors.
Challenges in the China Data Center Construction Market Sector
The China data center construction market faces several challenges:
- Land Availability and Costs: Securing suitable land for large-scale data center projects can be challenging and costly in densely populated areas.
- Energy Consumption: High energy consumption and associated carbon emissions are environmental concerns.
- Regulatory Compliance: Navigating complex regulatory requirements can add delays and costs to projects.
Emerging Opportunities in China Data Center Construction Market
Emerging opportunities include:
- Edge Data Centers: The growing need for low-latency data processing is creating opportunities for edge data centers closer to users.
- Sustainable Data Centers: The rising focus on environmental sustainability opens doors for energy-efficient data center designs and technologies.
- Specialized Data Centers: Demand is increasing for data centers tailored to specific industries, such as AI, finance, and healthcare.
Leading Players in the China Data Center Construction Market Market
- SAS Institute Inc
- Aueron Group
- JE Dunn Construction Group Inc
- Kienta Engineering Construction
- DSCO Group
- IBM Corporation
- Sato Kogyo (S) Pte Ltd
- Nakano Corporation
- Turner Construction Co
- DPR Construction Inc
- Hensel Phelps Construction Co Inc
- Obayashi Corporation
- CSF Group
- Gammon Construction Limited
- M+W Group GmbH
- AECOM
- NTT Ltd
Key Developments in China Data Center Construction Market Industry
- February 2023: CapitaLand Investment Limited announced the construction of hyperscale data centers in Greater Beijing, aiming to deliver over 100MW by 2025 and achieving LEED Gold certification.
- January 2022: Beijing Highlander Digital Technology Co Ltd. announced an USD 880 Million commercial underwater data center project, aligning with national sustainability goals.
Future Outlook for China Data Center Construction Market Market
The future of the China data center construction market looks promising, driven by continued government support, technological innovation, and increasing data consumption across various sectors. Strategic opportunities exist for companies focusing on energy efficiency, sustainability, and the development of specialized data center solutions. The market is poised for sustained growth, with further expansion into Tier 2 and Tier 3 cities and a diversification of end-user sectors.
China Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Infrastructure
-
1.1.2. Power Back-up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.1.5. Racks
- 1.2.1.6. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Ba
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-voltage
- 2.1.3.2. Medium-voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Infrastructure
-
2.2. Power Back-up Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Ba
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-voltage
- 3.3.2. Medium-voltage
- 3.4. Power Panels and Components
- 3.5. Other Infrastructure
-
4. Power Back-up Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-to-chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-row and In-rack Cooling
- 6.1.5. Racks
- 6.1.6. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-to-chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-row and In-rack Cooling
- 7.5. Racks
- 7.6. Other Mechanical Infrastructure
- 8. General Construction
-
9. Tier Type
- 9.1. Tier 1 and 2
- 9.2. Tier 3
- 9.3. Tier 4
- 10. Tier 1 and 2
- 11. Tier 3
- 12. Tier 4
-
13. End User
- 13.1. Banking, Financial Services, and Insurance
- 13.2. IT and Telecommunications
- 13.3. Government and Defense
- 13.4. Healthcare
- 13.5. Other End Users
- 14. Banking, Financial Services, and Insurance
- 15. IT and Telecommunications
- 16. Government and Defense
- 17. Healthcare
- 18. Other End Users
China Data Center Construction Market Segmentation By Geography
- 1. China

China Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 3.54% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. Increasing Demand for Supercomputing; Phenomenal Growth in E-commerce and Hi-tech Industries; Major Initiatives Undertaken by Governments to Promote Digital Economy and Connectivity Infrastructure
- 3.3. Market Restrains
- 3.3.1. High Power Consumption and emission contribution of Data Centers
- 3.4. Market Trends
- 3.4.1. Tier-3 is the largest Tier Type
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. China Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Infrastructure
- 5.1.1.2. Power Back-up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.1.5. Racks
- 5.1.2.1.6. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Ba
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-voltage
- 5.2.1.3.2. Medium-voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Infrastructure
- 5.2.2. Power Back-up Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Ba
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-voltage
- 5.3.3.2. Medium-voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Infrastructure
- 5.4. Market Analysis, Insights and Forecast - by Power Back-up Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-to-chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-row and In-rack Cooling
- 5.6.1.5. Racks
- 5.6.1.6. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-to-chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-row and In-rack Cooling
- 5.7.5. Racks
- 5.7.6. Other Mechanical Infrastructure
- 5.8. Market Analysis, Insights and Forecast - by General Construction
- 5.9. Market Analysis, Insights and Forecast - by Tier Type
- 5.9.1. Tier 1 and 2
- 5.9.2. Tier 3
- 5.9.3. Tier 4
- 5.10. Market Analysis, Insights and Forecast - by Tier 1 and 2
- 5.11. Market Analysis, Insights and Forecast - by Tier 3
- 5.12. Market Analysis, Insights and Forecast - by Tier 4
- 5.13. Market Analysis, Insights and Forecast - by End User
- 5.13.1. Banking, Financial Services, and Insurance
- 5.13.2. IT and Telecommunications
- 5.13.3. Government and Defense
- 5.13.4. Healthcare
- 5.13.5. Other End Users
- 5.14. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.15. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.16. Market Analysis, Insights and Forecast - by Government and Defense
- 5.17. Market Analysis, Insights and Forecast - by Healthcare
- 5.18. Market Analysis, Insights and Forecast - by Other End Users
- 5.19. Market Analysis, Insights and Forecast - by Region
- 5.19.1. China
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 SAS Institute Inc
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Aueron Group
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 JE Dunn Construction Group Inc
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 Kienta Engineering Construction
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 DSCO Group
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 IBM Corporation
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Sato Kogyo (S) Pte Ltd
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 Nakano Corporation
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 Turner Construction Co
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 DPR Construction Inc
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Hensel Phelps Construction Co Inc
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 Obayashi Corporation
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 CSF Group
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 Gammon Construction Limited
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 M+W Group GmbH
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.16 AECOM
- 6.2.16.1. Overview
- 6.2.16.2. Products
- 6.2.16.3. SWOT Analysis
- 6.2.16.4. Recent Developments
- 6.2.16.5. Financials (Based on Availability)
- 6.2.17 NTT Ltd
- 6.2.17.1. Overview
- 6.2.17.2. Products
- 6.2.17.3. SWOT Analysis
- 6.2.17.4. Recent Developments
- 6.2.17.5. Financials (Based on Availability)
- 6.2.1 SAS Institute Inc
List of Figures
- Figure 1: China Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: China Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: China Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: China Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: China Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: China Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: China Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 6: China Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 7: China Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 8: China Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 9: China Data Center Construction Market Revenue Million Forecast, by Power Back-up Solutions 2019 & 2032
- Table 10: China Data Center Construction Market Volume K Unit Forecast, by Power Back-up Solutions 2019 & 2032
- Table 11: China Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 12: China Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 13: China Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 14: China Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 15: China Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 16: China Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 17: China Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 18: China Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 19: China Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 20: China Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 21: China Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 22: China Data Center Construction Market Volume K Unit Forecast, by Tier 1 and 2 2019 & 2032
- Table 23: China Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 24: China Data Center Construction Market Volume K Unit Forecast, by Tier 3 2019 & 2032
- Table 25: China Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 26: China Data Center Construction Market Volume K Unit Forecast, by Tier 4 2019 & 2032
- Table 27: China Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 28: China Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 29: China Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 30: China Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 31: China Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 32: China Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 33: China Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 34: China Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 35: China Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 36: China Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 37: China Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 38: China Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 39: China Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 40: China Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 41: China Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 42: China Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 43: China Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 44: China Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 45: China Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 46: China Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 47: China Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 48: China Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 49: China Data Center Construction Market Revenue Million Forecast, by Power Back-up Solutions 2019 & 2032
- Table 50: China Data Center Construction Market Volume K Unit Forecast, by Power Back-up Solutions 2019 & 2032
- Table 51: China Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 52: China Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 53: China Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 54: China Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 55: China Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 56: China Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 57: China Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 58: China Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 59: China Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 60: China Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 61: China Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 62: China Data Center Construction Market Volume K Unit Forecast, by Tier 1 and 2 2019 & 2032
- Table 63: China Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 64: China Data Center Construction Market Volume K Unit Forecast, by Tier 3 2019 & 2032
- Table 65: China Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 66: China Data Center Construction Market Volume K Unit Forecast, by Tier 4 2019 & 2032
- Table 67: China Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 68: China Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 69: China Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 70: China Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 71: China Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 72: China Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 73: China Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 74: China Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 75: China Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 76: China Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 77: China Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 78: China Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 79: China Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 80: China Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the China Data Center Construction Market?
The projected CAGR is approximately 3.54%.
2. Which companies are prominent players in the China Data Center Construction Market?
Key companies in the market include SAS Institute Inc, Aueron Group, JE Dunn Construction Group Inc, Kienta Engineering Construction, DSCO Group, IBM Corporation, Sato Kogyo (S) Pte Ltd, Nakano Corporation, Turner Construction Co , DPR Construction Inc, Hensel Phelps Construction Co Inc, Obayashi Corporation, CSF Group, Gammon Construction Limited, M+W Group GmbH, AECOM, NTT Ltd.
3. What are the main segments of the China Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Back-up Solutions, Service , Mechanical Infrastructure, Cooling Systems, General Construction, Tier Type, Tier 1 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Increasing Demand for Supercomputing; Phenomenal Growth in E-commerce and Hi-tech Industries; Major Initiatives Undertaken by Governments to Promote Digital Economy and Connectivity Infrastructure.
6. What are the notable trends driving market growth?
Tier-3 is the largest Tier Type.
7. Are there any restraints impacting market growth?
High Power Consumption and emission contribution of Data Centers.
8. Can you provide examples of recent developments in the market?
February 2023: CapitaLand Investment Limited announced to construction of hyperscale data centers in Greater Bejing with CapitaLand China Data Centre Partners (CDCP) and deliver more than 100MW by 2025. The construction aims to support sustainability by acquiring certification from Energy and Environmental Design (LEED) Gold standards. Thus providing opportunities for the vendors in the market.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "China Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the China Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the China Data Center Construction Market?
To stay informed about further developments, trends, and reports in the China Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence