Key Insights
The Sweden data center construction market, exhibiting a Compound Annual Growth Rate (CAGR) of 5.89% from 2019 to 2024, is poised for continued expansion through 2033. Drivers include the burgeoning IT and telecommunications sector, increasing government and BFSI digitalization initiatives, and the rising demand for cloud services. This necessitates robust infrastructure to support data processing and storage, fueling demand for cooling systems, power infrastructure, server racks, networking equipment, and enhanced physical security. The market is segmented by infrastructure components (cooling, power, racks, servers, networking, security, design services, other), end-user sectors (IT & Telecom, BFSI, Government, Healthcare, others), facility tier (Tier 1-3), and data center size (small, medium, large, mega, massive). Key players like Aarsleff, Johnson Controls, Caverion, and Schneider Electric are strategically positioned to capitalize on growth opportunities. The increasing adoption of sustainable practices and the focus on energy efficiency within data centers will further shape market dynamics in the coming years.
While precise market sizing data for 2025 isn’t explicitly provided, reasonable estimation can be made by extrapolating from the given CAGR. Considering the robust growth drivers mentioned above, along with the expanding digital economy in Sweden, we can reasonably anticipate continued market expansion. This growth is likely to be driven primarily by larger enterprises and the adoption of hyperscale data center facilities. The competition among established players like IBM and NetApp, alongside regional specialists, will likely intensify. Potential restraints could include fluctuating energy prices, evolving regulatory frameworks, and the availability of skilled labor for construction and maintenance. However, the overall outlook remains positive, reflecting the critical role data centers play in Sweden’s digital infrastructure.
This in-depth report provides a comprehensive analysis of the Sweden Data Center Construction Market, offering valuable insights for industry professionals, investors, and strategic decision-makers. The study covers the period from 2019 to 2033, with a focus on the forecast period (2025-2033), base year (2025), and historical period (2019-2024). Discover key market trends, growth drivers, challenges, and opportunities shaping this dynamic sector.

Sweden Data Center Construction Market: Market Structure & Innovation Trends
This section analyzes the competitive landscape, innovation drivers, and regulatory environment of the Swedish data center construction market. The market exhibits a moderately concentrated structure, with key players such as Per Aarsleff A/S, Johnson Controls International PLC, Caverion Corporation, and Schneider Electric SE holding significant market share. However, the presence of numerous smaller, specialized firms contributes to a dynamic and competitive environment.
- Market Concentration: The market share of the top 5 players is estimated at xx%.
- Innovation Drivers: Sustainability initiatives (e.g., renewable energy integration), advancements in cooling technologies, and increasing demand for edge computing are major innovation drivers.
- Regulatory Framework: Swedish regulations related to data privacy, energy efficiency, and building codes significantly impact data center construction.
- Product Substitutes: While physical data centers remain dominant, cloud computing presents a partial substitute, influencing market growth.
- End-User Demographics: The IT & Telecommunication sector is the largest end-user segment, followed by the BFSI and Government sectors.
- M&A Activities: The past five years have witnessed xx M&A deals in the Swedish data center construction market, with a total estimated value of xx Million USD. These activities reflect strategic consolidation and expansion efforts.

Sweden Data Center Construction Market: Market Dynamics & Trends
The Swedish data center construction market is experiencing robust growth, driven by increasing digitalization, expanding cloud adoption, and rising data volumes. The market is projected to register a CAGR of xx% during the forecast period (2025-2033). This growth is fueled by several factors:
- Technological advancements: The adoption of innovative technologies like AI and IoT is driving demand for advanced data center infrastructure.
- Government initiatives: Government support for digital infrastructure development and incentives for sustainable data centers are boosting market expansion.
- Growing cloud adoption: The increasing preference for cloud services among businesses and consumers is a major catalyst for growth.
- Competitive dynamics: Intense competition among providers is pushing innovation and price optimization, benefiting end-users. Market penetration of Tier III data centers is expected to reach xx% by 2033.

Dominant Regions & Segments in Sweden Data Center Construction Market
Stockholm and other major metropolitan areas are leading the market, driven by high concentrations of businesses and data traffic. The IT & Telecommunication sector is the dominant end-user segment, accounting for approximately xx% of total market value. Within infrastructure, Power Infrastructure and Cooling Infrastructure are the largest segments due to high energy demands of data centers.
Key Drivers for Stockholm Region:
- Strong presence of major IT companies and data centers.
- Robust digital infrastructure and connectivity.
- Favorable government policies and incentives.
Dominant Segments:
- End-User: IT & Telecommunication (xx Million USD)
- Infrastructure: Power Infrastructure (xx Million USD), Cooling Infrastructure (xx Million USD)
- Data Center Size: Medium and Large data centers constitute the largest market share.
Sweden Data Center Construction Market: Product Innovations
Recent innovations focus on enhancing energy efficiency, improving security, and increasing scalability. Modular data center designs, liquid cooling systems, and advanced security features are gaining traction. These innovations improve operational efficiency and reduce environmental impact, aligning with market demands for sustainability and cost optimization.
Report Scope & Segmentation Analysis
This report provides a granular segmentation of the Swedish data center construction market across various parameters:
Infrastructure: Cooling Infrastructure, Power Infrastructure, Racks and Cabinets, Servers, Networking Equipment, Physical Security Infrastructure, Design and Consulting Services, Other Infrastructure. Each segment's growth is projected based on specific market drivers and technological advancements.
End-User: IT & Telecommunication, BFSI, Government, Healthcare, Other End-User. Market size and growth projections for each segment reflect the specific needs and investment patterns of different sectors.
Type: Tier 1, Tier 2, Tier 3. The analysis considers the varying requirements and market dynamics for each tier of data center.
Data Center Size: Small, Medium, Large, Mega, Massive. The segmentation acknowledges the diversity in scale and associated market opportunities.
Key Drivers of Sweden Data Center Construction Market Growth
The growth of the Swedish data center construction market is fueled by:
- Digital transformation: Increased reliance on digital technologies across sectors drives data center needs.
- Cloud computing expansion: The growing adoption of cloud-based services necessitates robust data center infrastructure.
- Government initiatives: Government support for digital infrastructure development stimulates market expansion.
- Stringent data security and compliance regulations: Compliance with data privacy regulations motivates investments in secure data centers.
Challenges in the Sweden Data Center Construction Market Sector
The sector faces challenges such as:
- High energy costs: The high cost of electricity in Sweden impacts operational expenses.
- Supply chain disruptions: Global supply chain issues can delay project completion and increase costs.
- Competition: Intense competition necessitates efficient operations and innovation. The market is estimated to have a xx% growth rate for the next 5 years.
Emerging Opportunities in Sweden Data Center Construction Market
Emerging opportunities include:
- Sustainable data centers: The growing focus on environmental sustainability presents opportunities for eco-friendly solutions.
- Edge computing: The rising demand for edge computing necessitates the construction of smaller, distributed data centers.
- Hyperscale data center deployments: Major cloud providers are investing in large-scale data centers in Sweden.
Leading Players in the Sweden Data Center Construction Market Market
- Per Aarsleff A/S
- Johnson Controls International PLC
- Caverion Corporation
- Dornan (Engineering Works)
- IBM Corporation
- Legrand SA
- NetApp Inc
- ALFA LAVAL AB
- Schneider Electric SE
- Arista Networks
- DPR CONSTRUCTION INC
- Arup Group Limited
- Kirby Group Engineering
- AECOM
- Coromatic AB Sweden
Key Developments in Sweden Data Center Construction Market Industry
October 2022: Conapto and Fastpartner signed an agreement to construct a 10,000-square-meter data center in southern Stockholm, with capacity for an 8000 square meter facility and 20 MW of power. This signifies significant investment in the market.
February 2022: EcoDataCenter invested approximately 4.79 Million USD in a collaborative initiative with Ellevio and Falu Energi & Vatten to secure 80 MW of renewable electricity, highlighting a commitment to sustainable data center operations.
Future Outlook for Sweden Data Center Construction Market Market
The Swedish data center construction market is poised for continued growth, driven by the ongoing digital transformation and the increasing adoption of cloud services. Strategic investments in sustainable and efficient data center infrastructure will play a critical role in shaping the future market landscape. The market is expected to witness significant expansion, driven by increased demand from various sectors and technological advancements. Opportunities abound for companies that can offer innovative, sustainable, and cost-effective solutions.
Sweden Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. By Electrical Infrastructure
-
1.1.1. Power Distribution Solutions
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Back-up Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solutions
-
1.2. By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. By Electrical Infrastructure
-
2. Tier Type
- 2.1. Tier I and II
- 2.2. Tier III
- 2.3. Tier IV
-
3. End User
- 3.1. Banking, Financial Services, and Insurance
- 3.2. IT and Telecommunications
- 3.3. Government and Defense
- 3.4. Healthcare
- 3.5. Other End Users
Sweden Data Center Construction Market Segmentation By Geography
- 1. Sweden

Sweden Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 5.89% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
- 3.3. Market Restrains
- 3.3.1. Security Challenges Impacting Growth of Data Centers
- 3.4. Market Trends
- 3.4.1. IT and Telecom to have significant market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Sweden Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solutions
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Back-up Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solutions
- 5.1.2. By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Tier Type
- 5.2.1. Tier I and II
- 5.2.2. Tier III
- 5.2.3. Tier IV
- 5.3. Market Analysis, Insights and Forecast - by End User
- 5.3.1. Banking, Financial Services, and Insurance
- 5.3.2. IT and Telecommunications
- 5.3.3. Government and Defense
- 5.3.4. Healthcare
- 5.3.5. Other End Users
- 5.4. Market Analysis, Insights and Forecast - by Region
- 5.4.1. Sweden
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 Per Aarsleff A/S
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Johnson Controls International PLC
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 Caverion Corporation
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 Dornan(Engineering Works)
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 IBM Corporation
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Legrand SA
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 NetApp Inc
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 ALFA LAVAL AB
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 Schneider Electric SE
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Arista Networks
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 DPR CONSTRUCTION INC
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 Arup Group Limited
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 Kirby Group Engineering
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 AECOM
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 Coromatic AB Sweden
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.1 Per Aarsleff A/S
List of Figures
- Figure 1: Sweden Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Sweden Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Sweden Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Sweden Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: Sweden Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: Sweden Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: Sweden Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 6: Sweden Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 7: Sweden Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 8: Sweden Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 9: Sweden Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 10: Sweden Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 11: Sweden Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 12: Sweden Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 13: Sweden Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 14: Sweden Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 15: Sweden Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 16: Sweden Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 17: Sweden Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 18: Sweden Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 19: Sweden Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 20: Sweden Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Sweden Data Center Construction Market ?
The projected CAGR is approximately 5.89%.
2. Which companies are prominent players in the Sweden Data Center Construction Market ?
Key companies in the market include Per Aarsleff A/S, Johnson Controls International PLC, Caverion Corporation, Dornan(Engineering Works), IBM Corporation, Legrand SA, NetApp Inc , ALFA LAVAL AB, Schneider Electric SE, Arista Networks, DPR CONSTRUCTION INC, Arup Group Limited, Kirby Group Engineering, AECOM, Coromatic AB Sweden.
3. What are the main segments of the Sweden Data Center Construction Market ?
The market segments include Infrastructure, Tier Type, End User.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades.
6. What are the notable trends driving market growth?
IT and Telecom to have significant market share.
7. Are there any restraints impacting market growth?
Security Challenges Impacting Growth of Data Centers.
8. Can you provide examples of recent developments in the market?
October 2022: Conapto and the real estate firm Fastpartner signed an agreement to construct a 10,000-square-meter data center building in southern Stockholm. This land can accommodate an 8000 square meter data center and 20 MW of power when fully built.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Sweden Data Center Construction Market ," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Sweden Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Sweden Data Center Construction Market ?
To stay informed about further developments, trends, and reports in the Sweden Data Center Construction Market , consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence